To shorten the production cycle under the premise of ensuring the quality of the charging treasure mold, you can start from the following aspects:

Design phase

1. Clarify the requirements
– Before the design begins, communicate fully with the customer to ensure a clear understanding of the design requirements of the rechargeable treasure, functional requirements, size specifications. Avoid repeated design revisions and wasted time due to unclear requirements. You can ensure that both parties have a consistent understanding of the project objectives through detailed requirements documents, sample presentations, technical exchanges, and so on.
2. Optimize design
– Use advanced design software and technology to optimize the design of the mold structure. For example, use tools such as finite element analysis to simulate and analyze the strength, stiffness and cooling system of the mold, so as to discover potential problems in advance and optimize them. This can reduce design changes and debugging time at a later stage.
– Design standardization module. For some common structures and components, standardized design modules can be used to reduce design time and processing difficulty. For example, parts such as the snap structure and battery compartment of the rechargeable treasure mold can be designed in a standardized way to improve design efficiency.

Material Procurement Stage

1. Establish stable supplier relationship
– Establish long-term relationships with reliable material suppliers to ensure the quality and supply stability of materials. Communicate with suppliers in advance about project requirements, and understand the inventory of materials and production cycles so as to arrange timely procurement plans. You can sign long-term procurement contracts for more favorable prices and better services.
2. Reasonable arrangement of material procurement time
– Reasonable arrangement of material procurement time according to the mold production plan. Avoid too early purchasing to cause material inventory backlog, also avoid too late purchasing to affect the production schedule. You can consult with suppliers to determine the best procurement time point to ensure that the material is in place in time when needed.

Processing and manufacturing stage

1. Select efficient processing equipment and processes
– Selecting advanced processing equipment, such as high-speed machining centers and EDM machines, can improve processing efficiency and precision. At the same time, optimize the machining process, using reasonable cutting parameters, machining sequence, etc., to reduce the machining time. You can have technical exchanges with machining manufacturers to understand the advantages and disadvantages of different equipment and processes, and choose the most suitable machining program for your project needs.
2. Parallel machining
– For the various parts of the mold, you can use parallel processing to process multiple parts at the same time to shorten the overall processing time. For example, when processing the upper and lower molds of the rechargeable treasure mold, other parts can be processed at the same time, such as the slider, slanting roof, etc.
3. Quality control
– Strengthen the quality control during processing to avoid rework and repair due to quality problems. Establish strict quality inspection standards and procedures for each processing link to ensure that the processing quality meets the requirements. Timely detection of problems and deal with them, to avoid the accumulation of problems to the later stages of the impact on the production schedule.

**Fourth, commissioning and acceptance phase **

1. Prepare debugging work in advance
– Before the completion of mold processing, prepare in advance for debugging the necessary equipment, tools and personnel. Develop a detailed debugging plan, clear debugging steps and methods. This can be done after the mold processing is completed, debugging work quickly to reduce the waiting time.
2. Rapid debugging and problem solving
– In the debugging process, find problems in time and carry out rapid solution. The establishment of problem feedback mechanism, and design, processing and other departments to work closely together to solve the problems arising in the debugging. On-site meetings, remote collaboration and other methods can be used to improve the efficiency of problem solving.
3. Strict acceptance criteria
– Develop strict acceptance criteria to ensure that the quality of the mold meets the requirements. In the acceptance process, carefully check the dimensional accuracy of the mold, surface quality, structural strength and other aspects of the non-compliance with the requirements of the place in a timely manner for rectification. Only through strict acceptance can we ensure the quality and performance of the mold.

Through the comprehensive application of the above measures, we can effectively shorten the production cycle and improve the production efficiency under the premise of ensuring the quality of rechargeable treasure mold.